Tuesday, February 9, 2010 -
Remodeling Day 3
Today was spent running
errands and gathering supplies - who knew it could take so long at a
hardware store? The first run was to Wal-Mart to get a much needed
broom and some posion for some unwelcome house guests and then we went to
the sanitation department to get a large dumpster set. We visited
both hardware stores in town to get the list of supplies Joe had asked for
and hopefully we are done shopping for a while. By the time we had
every gathered and were headed to the new house we saw the "dumpster man"
(as the kids lovingly dubbed him) going down the street. We made a
quick dash to the car and were able to watch him set the dumpster at the
new house (the small things really do amuse us). After he was done
we unloaded all of our supplies, put them away and headed back to the old
house so I could get ready for scouts. Joe took Krista and Corey
back this evening so they could get some actual work accomplished for the
day, and they did. They were able to get out almost all of the
carpet and more paneling down and of course all of our piles went out to
the dumpster.


Monday, February 8, 2010 - Remodeling
Day 2
This afternoon the kids and I
(kids = Sydnee, Krista and Corey) went down to the new house and removed
the rest of the outlet covers and switchplates. We took down the
trim in the living room we could reach, but had to wait on Jody to take
down the top trim so we could not take down any paneling. I took
down all of the wall trim in Sydnee's room and then she and Corey pulled
up the carpet in her room. We were surprised to see more patched
hardwood in her room, the area we had originally peeked under looked like
linoleum tiles. After dinner, we all went back down to the house and
Jody pulled the rest of the trim in the living room and took down the
paneling. With Sydnee's help, he took down all of the trim in the
dining room and removed the paneling in that room as well. The old
tile ceiling in the hall by Sydnee's room came down too. Krista and
Corey removed the cabinet hardware in the kitchen and all of the kids
worked together to pull up the carpet in the family room. Tomorrow
we will see about getting a large dumpster since we are getting carpet
piles all over the house. (c:


Sunday, February 7, 2010 - Remodeling
Day 1 Photos
Today was a fairly productive
day. The girls and I went to the house this morning and worked at
tearing out carpet. We were able to completely remove it from
Krista's room (well, at least to her doorway) and most of it from the
dining room. We were a little disappointed to find the largest part
of the hardwood flooring had been removed from the dining room. The
original plan was to have the hardwood refinished in the living, dining
and Krista's room. We haven't gotten the carpeting up in the living
room yet, but where the two rooms meet (living and dining) there is
plywood instead of hardwood, so we've accepted the fact that we will most
likely be carpeting the entire house. We went pretty unprepared (ok,
totally unprepared) so that's as much as we could do without a box
knife as all of the carpeting is attached from room to room. We then
went to lunch with Jody, gathered needed supplies (including some very
cute overalls for Krista, we're still looking for some for Sydnee) and
went out to a friend's house to pick up a heater. Then Jody and I
went back to the house and got all of the paneling down in Krista's room.